Kinsmen Arena Ice Systems Upgrades
The City of Yorkton is undertaking a renovation project at the Kinsmen Arena to extend the longevity of the ice systems for future years. Approved as part of the 2023, 2024, and 2025 capital budgets, this project will entail:
- The removal of the existing rink system, including boards, glass, player benches, spectator seating, and the concrete arena floor.
- Removal and replacement of the ground soils, forming a strong, solid base for the new arena slab floor.
- Installation of new rink systems, including the concrete arena floor (complete with new refrigeration piping), new rink boards, arena glass, player benches, spectator seating, and other arena amenities.
- Installation of dehumidification for the arena
- Code and ice plant upgrades
This project was approved and funding allocated following the Gallagher Centre Renewal Project, and in addition to the Westland Arena Ice Plant Upgrades Project, which was completed in 2023.
Subscribe to this project page to stay up to date on the work happening as part of the Kinsmen Arena Ice Systems Upgrades!
The City of Yorkton is undertaking a renovation project at the Kinsmen Arena to extend the longevity of the ice systems for future years. Approved as part of the 2023, 2024, and 2025 capital budgets, this project will entail:
- The removal of the existing rink system, including boards, glass, player benches, spectator seating, and the concrete arena floor.
- Removal and replacement of the ground soils, forming a strong, solid base for the new arena slab floor.
- Installation of new rink systems, including the concrete arena floor (complete with new refrigeration piping), new rink boards, arena glass, player benches, spectator seating, and other arena amenities.
- Installation of dehumidification for the arena
- Code and ice plant upgrades
This project was approved and funding allocated following the Gallagher Centre Renewal Project, and in addition to the Westland Arena Ice Plant Upgrades Project, which was completed in 2023.
Subscribe to this project page to stay up to date on the work happening as part of the Kinsmen Arena Ice Systems Upgrades!
-
Gallagher Centre Renewal Project
October 2019 - Recreation Facility Master Plan
An Indoor Recreation Facility Master Plan was presented to City Council, where a recommendation to replace the Kinsmen Arena by adding a second ice surface to the Gallagher Centre was made. Council authorized Administration to continue planning the Kinsmen Arena replacement at the Gallagher Centre, known as the Gallagher Centre Renewal Project.
April 2021 - Gallagher Centre Renewal Project
A presentation was made at a Council Committee of the Whole meeting to inform discussions regarding the Gallagher Centre Renewal Project. Council formally passed a motion to get a more detailed assessment and costing on repairing the mechanical/building systems for both the Kinsmen Arena and the Westland Arena. The intent was to obtain a consultant opinion of the condition and cost estimated to ensure that the ice plant and related mechanical/building systems could support ice for the next 15 years. Detailed information and project timelines related to the Kinsmen Arena Ice Systems Upgrades can also be found on the Westland Arena Ice Plant Upgrades Project page.
During the summer and fall of 2021, Administration engaged the following consultants to complete an assessment of the various components that support ice mating and maintenance at the Kinsmen Arena:
- Strong Refrigeration – to conduct an assessment of the refrigeration plant and related components, and provide recommendations for improvements to ensure continued use of the Kinsmen Arena, as an ice arena.
- BST Consulting – to conduct an assessment of the arena slab floor, header pipe and trench to assess the overall condition of the slab, and to provide recommendations on repairs or replacement.
- Strong Refrigeration – to determine the ventilation and dehumidification requirements needed to ensure both human safety and facility structure sustainability.
November 2021 - Kinsmen Arena Ice Systems UpgradeThe assessment reports completed by the consultants were provided to City Council. Council deferred a decision on moving forward with upgrades to the ice systems at the Kinsmen Arena to the 2022 budget discussions.
February 2022 - Capital Budgets Approved
City Council approved the 2022 and 2023 capital budgets, which included the upgrades to the Kinsmen Arena Ice systems as follows:
Kinsmen Arena $2,775,000 $1,203,100
Remove concrete slab/arena boards/piping & thaw/remove/replace soils
$206,700
New Arena Boards and Glass
$665,000
Code and Ice plant upgrades
$700,200
Dehumidification
-
Kinsmen Arena Summary of History
The following is a summary of the studies and direction related to the Kinsmen Arena Ice System Upgrades Project. Many other community and Council discussions and project team meetings took place but have not been included here.
March 2010 - Kinsmen Arena Conceptual Planning
Stantec Consulting completed a conceptual plan for improvements to the Kinsmen Arena which included a new lobby, renovated dressing rooms and other minor upgrades. The estimated budget was $3.5 million. Council deferred any decision until the completion of the 2020 strategic plan.
August 17, 2011 - Kinsmen Arena Building Envelop Inspection
Concerns regarding high levels of humidity and early ice bookings triggered an investigation into the building envelope and mechanical systems within the arena at the Kinsmen Arena. Associated Engineering conducted preliminary inspections and assessments related to mechanical systems and humidity impacts on the building.
April 20, 2012 - Kinsmen Arena Air Quality & Asbestos Survey
Canadian Indoor Air Quality conducted an Asbestos Survey of the Kinsmen Arena. Areas identified as containing asbestos were appropriately marked to ensure that if they were ever required to be disturbed, it would be done appropriately safe. Asbestos was also identified in the exterior wall insulation.
June 6, 2012 - Kinsmen Arena Building Systems Assessment
Associated Engineering completed an in-depth, visual and physical assessment of building systems in the arena (arena only). Recommendations totaling $1.14 million were provided to address the negative impact of the humidity in the arena proper.
June 2012 - Council Direction: Kinsmen Arena 10 Year Plan
Council directed Administration to plan for the replacement of the Kinsmen Arena so that it would be available to the public in 10 years-time and to bring forward capital projects that would ensure its use until that time.
November 27, 2012 - Kinsmen Arena Inspection
Associated Engineering was asked to continue their assessment and completed a multi-discipline visual inspection of the remainder of the building. The conclusion was “that the arena could be left as is, and still function as it does, however the deterioration will continue, resulting in the facility becoming sub-standard and possibly unusable.” The total estimated improvement costs (including items from June 6, 2012 above) was set at $3.1 million.
February 14, 2013 - Kinsmen Arena Air Quality & Mold Assessment
Canadian Indoor Air Quality conducted an Environmental Mold Assessment of the Kinsmen Arena, which showed no air quality issues, however some areas had significant contamination which required remediation. Their conclusion was that dehumidification and improvement to the exterior envelope of the building should be addressed in order to control mold growth.
2013 - Kinsmen Arena Roof Vents Sealed
Roof vents were sealed at the Kinsmen Arena to reduce mix of warm, humid air with cold dry air, which creates humidity concerns, as per Associated Engineering recommendation, and Council direction from 2012.
2014 - Kinsmen Arena New Doors
New doors installed in the arena envelope at the Kinsmen arena to reduce mix of warm, humid air with cold dry air, which creates humidity concerns, as per Associated Engineering recommendation, and Council direction, from 2012.
2015 - Kinsmen Arena Gable End Wall Removal
Gable end walls, which were wet and mouldy, were removed at the Kinsmen Arena and replaced and seal, as per Associated Engineering recommendation, and Council direction, from 2012.
This was the end of the work required to meet Council’s direction from 2012 which was to plan for new facility to ready in 2022 and ensure the Kinsmen Arena could be maintained sufficiently until a new facility was ready.
Additional significant resources were required beyond these minor improvements, however investing these resources into a deteriorating facility, and for which direction for the planning had been provided, was not a priority.
Focus then shifted to the arena at the Gallagher Centre, due to a request by the Yorkton Terriers to modernize their dressing room facilities. This, combined with the previous direction to plan for the replacement of the Kinsmen Arena, triggered consideration of locating the Kinsmen Arena at the Gallagher Centre which resulted in the Gallagher Centre Renewal Project.
Follow Project
Who's Listening
-
TM
Email parksandrec@yorkton.ca -
DB
Email parksandrec@yorkton.ca
Timeline
-
Open
Kinsmen Arena Ice Systems Upgrades has finished this stageThis consultation is open for contributions.
-
Under Review
Kinsmen Arena Ice Systems Upgrades has finished this stageContributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
-
Final report
Kinsmen Arena Ice Systems Upgrades has finished this stageThe final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.
-
Tendering
Kinsmen Arena Ice Systems Upgrades has finished this stageThe project is out for Tender.
-
Award Contractor
Kinsmen Arena Ice Systems Upgrades has finished this stagePCL Construction Management Inc.
-
Construction Begins
Kinsmen Arena Ice Systems Upgrades has finished this stageJanuary 2025
-
Removal of rink boards, arena glass, bleachers, etc.
Kinsmen Arena Ice Systems Upgrades has finished this stage -
Removal and abatement of lead paint within the rink area
Kinsmen Arena Ice Systems Upgrades is currently at this stage -
Demolition and excavation of the arena floor and ground material
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Backfill and compaction for new ground material base
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Concrete floor assembly and pour
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Concrete cure time
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Install new rink boards, arena glass, bleachers, etc.
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Finishing (paint, rubber flooring, etc.)
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Commissioning
this is an upcoming stage for Kinsmen Arena Ice Systems Upgrades -
Project completion and start making ice for 2025-2026 season
this is an upcoming stage for Kinsmen Arena Ice Systems UpgradesSeptember 2025