Concrete & Pipe Cutting

April 3, 2025

Work is being done to cut up the existing concrete floor into sections prior to the upcoming excavation. The arena slab is roughly 7 inches thick, and contains the many lines of piping that keeps the floor cold enough to make ice. Once cutting is complete the intent is to "pop" the smaller section up to be removed, and then begin removing the ground materials underneath the concrete floor.