• Please use tab to navigate through video controls.
  • Upon entering the player press space bar to reach the play button

Phase 4 - North drainage channel

Key drainage channel on the north end of the City; and large box culverts were installed across York Road to improve stormwater removal from many inner City areas.


Phase 4 - North drainage channel
Phase 4 - North drainage channel
Key drainage channel on the north end of the City; and large box culverts were installed across York Road to improve stormwater removal from many inner City areas.
York Road Corridor
York Road Corridor