Snow Plowing - 1st Priority Streets, Starting Feb 26, 7:30 A.M

Roadway crews will be clearing the 1st Priority Streets beginning Monday, February 26, 2024, at 7:30 A.M. starting with highways, and then arterial thoroughfares, sidewalks, and parking lots.

If possible, please remove any vehicles from the designated streets during this time.

This has been triggered because there is 2” (5 cm) of accumulated snow on the street.

As the snow is being cleared, sanding and salting operations will follow.

  • If it is below (-20°C) salting will be spread on the designated areas to ensure safety.
  • If it is above (-20°C), sanding will be spread on the designated areas to ensure safety.
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>