Snow Plowing - 1st Priority Streets, continues Feb 29, 7:00 A.M

Roadway crews continue clearing, sanding, and salting the 1st Priority Streets focused on arterial thoroughfares, back lanes - Priority lanes, Sidewalks and City Parking lots.

If possible, please remove any vehicles from the designated streets during this time.

This has been triggered because there is 2” (5 cm) of accumulated snow on the street.

As the snow is being cleared, sanding and salting operations will follow.

  • If it is below (-20°C) salting will be spread on the designated areas to ensure safety.
  • If it is above (-20°C), sanding will be spread on the designated areas to ensure safety.
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>