Location: McBurney Drive from McNeil Crescent to Matheson Crescent.
Proposed Project Includes:
The City’s 2024 water main replacement program is scheduled to replace 370 meters of 150 mm (6 inch) Asbestos Cement (AC) or also referred to as transite pipe on McBurney Drive from McNeil Crescent to Matheson Crescent.
Since its original installation in 1976, this section of the water main has experienced 7 breaks, many of which were classified as service leaks and stress cracks indicating pipe integrity is compromised.
The objective of the City’s water main replacement programs is to improve the health of the distribution system, reduce operating costs and service level impacts, and protect the safety of the distribution system.
The Water Main Replacement program will happen in two phases. The first phase will be on McBurney Drive from McNeil Crescent to midway towards Matheson Crescent, then the second phase will be on McBurney Drive from the end of phase one to Matheson Crescent.
The estimated cost of the 2024 water main replacement program on McBurney is $2,715,000.00 including engineering, construction, material testing, contingency and taxes.
How to get engaged:
Post questions you may have on our Q&A section.
Project Details:
Start Date: May 15, 2024
Expected date of completion: September 30, 2024
Working Hours: 7:00 A.M. to 7:00 P.M.
Location: McBurney Drive from McNeil Crescent to Matheson Crescent.
Proposed Project Includes:
The City’s 2024 water main replacement program is scheduled to replace 370 meters of 150 mm (6 inch) Asbestos Cement (AC) or also referred to as transite pipe on McBurney Drive from McNeil Crescent to Matheson Crescent.
Since its original installation in 1976, this section of the water main has experienced 7 breaks, many of which were classified as service leaks and stress cracks indicating pipe integrity is compromised.
The objective of the City’s water main replacement programs is to improve the health of the distribution system, reduce operating costs and service level impacts, and protect the safety of the distribution system.
The Water Main Replacement program will happen in two phases. The first phase will be on McBurney Drive from McNeil Crescent to midway towards Matheson Crescent, then the second phase will be on McBurney Drive from the end of phase one to Matheson Crescent.
The estimated cost of the 2024 water main replacement program on McBurney is $2,715,000.00 including engineering, construction, material testing, contingency and taxes.
The McBurney Water Main Replacement project is making significant progress, and weβre excited to share the latest updates with our community!
Phase 1:
Status: This phase is now open to local traffic! π
Next Steps: While the main work is complete, there are still some final touches needed. Landscaping in this section is ongoing and will be wrapped up soon.
Phase 2:
Status: The water main replacement is well underway, with approximately 35% of the work completed so far.
Looking Ahead: We're on track to finish by September 30th, but please note that this timeline is weather-dependent.
We appreciate your patience and cooperation as we work to improve our infrastructure. Stay tuned for more updates, and thank you for your continued support!
The McBurney Water Main Replacement project is making significant progress, and weβre excited to share the latest updates with our community!
Phase 1:
Status: This phase is now open to local traffic! π
Next Steps: While the main work is complete, there are still some final touches needed. Landscaping in this section is ongoing and will be wrapped up soon.
Phase 2:
Status: The water main replacement is well underway, with approximately 35% of the work completed so far.
Looking Ahead: We're on track to finish by September 30th, but please note that this timeline is weather-dependent.
We appreciate your patience and cooperation as we work to improve our infrastructure. Stay tuned for more updates, and thank you for your continued support!
π§ Water Main Replacement Update on McBurney Drive π§
The project is now approximately 40% completed, with Phase 1 reaching 80% completion. ποΈ On July 4 and 5, most residents in Phase 1 were successfully taken off temporary water and reconnected to their permanent water service. π§
π Over the next two weeks, residents can expect ongoing roadwork and concrete work as the project continues to advance. The project team remains committed to minimizing disruptions and ensuring a smooth transition as the work progresses.
π² Stay up-to-date with construction happening in your area by visiting www.yorkton.ca/voyentalert and sign up today!
π§ Water Main Replacement Update on McBurney Drive π§
The project is now approximately 40% completed, with Phase 1 reaching 80% completion. ποΈ On July 4 and 5, most residents in Phase 1 were successfully taken off temporary water and reconnected to their permanent water service. π§
π Over the next two weeks, residents can expect ongoing roadwork and concrete work as the project continues to advance. The project team remains committed to minimizing disruptions and ensuring a smooth transition as the work progresses.
π² Stay up-to-date with construction happening in your area by visiting www.yorkton.ca/voyentalert and sign up today!
π Starting Monday, May 13: McBurney Drive between McNeil Crescent and Matheson Crescent will be closed for a water main replacement.
π« Street Parking: Please be advised that street parking in this area will be restricted during construction. Affected residents will receive a letter from the contractor, Ungar Construction, before construction, and signage will be posted by Ungar Construction to identify street closures and detours.
π§ Water Main Replacement Program:
Phase 1: McBurney Drive from McNeil Crescent to midway towards Matheson Crescent.
Phase 2: McBurney Drive from the end of Phase 1 to Matheson Crescent.
π² Watch for updates through our notification system, Voyent Alert, and on our Facebook and Instagram pages. www.yorkton.ca/voyentalert
πΈ Reminder: Please slow down and follow signage when approaching/entering a construction zone.
π§ Road Closure Alert π§
π Starting Monday, May 13: McBurney Drive between McNeil Crescent and Matheson Crescent will be closed for a water main replacement.
π« Street Parking: Please be advised that street parking in this area will be restricted during construction. Affected residents will receive a letter from the contractor, Ungar Construction, before construction, and signage will be posted by Ungar Construction to identify street closures and detours.
π§ Water Main Replacement Program:
Phase 1: McBurney Drive from McNeil Crescent to midway towards Matheson Crescent.
Phase 2: McBurney Drive from the end of Phase 1 to Matheson Crescent.