Cold Floor Piping and Rebar Work

The final stages of floor preparation are under way, as we get closer and closer to pouring the new arena slab. The sand bed over the warm floor piping has been installed, along with ground poly covering and cold floor insulation. Currently, rebar is being laid out over the floor, with the cold floor piping to follow. Once these items are completed the project will shift to prepping and pouring concrete for the arena floor.

#<Object:0x000000002b447750>