You need to be signed in to add your comment.

Building foundation in progress

In the attached photo you can see a foundation which creates a typical crawl space under a building to house the ducting for the HVAC as well as the plumbing and electrical runs. There will also be a mechanical room housing the mechanical and electrical equipment. The space will not be filled completely with sand, there will be some fill installed to taper the inside slope for drainage and then the installation of a permalon radon barrier.

Consultation has concluded

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>