Snow Plowing 2nd Priority Streets - Nov 25, 2024, at 11 P.M.

Roadway crews will be clearing the 2nd Priority Streets beginning today, Monday, November 25, 2024, at 11 P.M.

If possible, please remove any vehicles from the designated streets during this time.

As the snow is being cleared, sanding and salting operations will follow.

If it is below (-20°C) salting will be spread on the designated areas to ensure safety.

If it is above (-20°C), sanding will be spread on the designated areas to ensure safety.

<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>