Making Progress
Work is continuing on the water park shutdown maintenance, in addition to the filtration and UV projects. A few maintenance items being worked on include:
- Calcium removal from tile throughout the water park.
- Skimmer cleaning and grouting.
- Repairs to the wave generator air baffles (the system that makes the waves).
- Rust removal and painting of the water slide structure.
- Stripping and removal of old caulking on the water slide, preparing for buffing, waxing, and resealing the joints.
- Deck drain flushing.
- Remove, clean, and reseal drains in the lap pool.
For the filtration and UV project:
- Three filter tanks have been placed.
- Work started on required piping and valve replacement
- Strainer baskets are being installed.