Resurfacing
Here’s a look at what’s been completed so far:
- Holes were bored for future net installation, with plywood placed to protect the asphalt surface during the process.
- The courts were cleaned and prepped for finishing.
- Self-levelling patches were applied where needed.
- The first layer of black acrylic surfacing was completed.
- The blue pickleball and tennis layouts, patterns, and lines were applied.
- A green acrylic coating was added to complete the playing surface.
- Final game lines were painted.
- Nets and poles have now been installed.
With this, the project is essentially complete! However, the courts need at least a week to properly cure. To celebrate, we’ll be hosting a Grand Opening — meaning the courts will remain closed until that day. Stay tuned for details!

Thank you for your contribution!