Proof Roll and North Side Build-Up

Proof Roll on Existing Asphalt
Over the past week, crews completed a proof roll on the existing asphalt surface to assess its structural integrity and suitability for reuse. This process involved running heavy equipment over the area to identify any weak or soft spots. The results were encouraging and will help guide the next steps in surface preparation.

North Side Build-Up Underway
Significant progress has also been made on the north side of the development, where crews are actively working to build up the subgrade in preparation for future paving.



#<Object:0x00000000408ae220>